Cultural Mass — A three-storey contemporary art museum in Zurich's Manegg quarter by OBELISK Architecture. Long horizontal mass with a 12.5-metre cantilever projecting toward the lakeshore. Board-formed concrete with weathering-steel mullions.
Index/ Work/ Cultural Mass
Cultural · Zurich · 2023 · DWG-002

Cultural Mass.

Zurich, Switzerland

A three-storey cultural building for a contemporary art foundation in the Manegg quarter. A single 12.5-metre cantilever projects over the lakeshore; post-tensioned slab, board-formed concrete core, a 12-metre linear rooflight to the atrium.

Type
CULT
Cultural building + galleries
GFA
4,200 m²
Gross floor area
Cantilever
12.5 m
Post-tensioned · over lakeshore
Storeys
3
Above grade · 16 m height
Year
2023
Completed · RIBA International Prize 2022

§ DWG-002 · the building

A single, weighted civic mass.

The brief from the foundation asked for a quiet, permanent home for a collection that had spent fifteen years in temporary spaces. The site, on the western edge of the Sihl, set a long horizontal footprint and an 11-metre height limit. We answered with a single mass — three gallery floors above, two service floors below grade — and let the cantilever over the lakeshore be the building's only gesture.

The structural system is a post-tensioned reinforced-concrete slab on a cast-in-place board-formed core, with a perimeter of weathering-steel mullions. The board-formed finish — wider, more vertical, less precise than the German technique — was specified to give the surface a domestic grain that a person reads at arm's length. The mullions oxidised to copper tone in the eighteen months after pour.

The 12-metre linear rooflight is the building's quietest piece of engineering. A single 1.4-tonne pane of low-iron glass sits on a steel ring beam; the roof slopes inward 1.5 degrees from both sides, so rain drains laterally rather than across the glass. The building opened in March 2023; the Pritzker nomination arrived that September.